{"id":52,"date":"2021-07-16T00:18:01","date_gmt":"2021-07-16T00:18:01","guid":{"rendered":"https:\/\/infrastruktur-hijau.id\/?page_id=52"},"modified":"2022-06-02T06:27:04","modified_gmt":"2022-06-02T06:27:04","slug":"about","status":"publish","type":"page","link":"https:\/\/gii.maritim.go.id\/en\/about\/","title":{"rendered":"About Us"},"content":{"rendered":"<h2 id=\"custom-title-h2-1\" class=\"ui--animation \" style=\"\">About GII<\/h2><div  class=\"ui--tabs ui--tabs-mini ui--tabs-mini-horizontal clearfix text-left\"><div class=\"ui--tabs-header clearfix\"><div class=\"ui--tabs-header-holder\"><div class=\"ui--tabs-border-before\"><\/div><div class=\"ui--tabs-border-after\"><\/div><ul class=\"ui--tabs-titles clearfix unstyled\"><li class=\"\"><h5><a href=\"#about-us\">Green Infrastructure Initiative (GII)<\/a><\/h5><\/li><li class=\"\"><h5><a href=\"#giiprojects\">GII Projects<\/a><\/h5><\/li><\/ul><\/div><\/div><div class=\"clearfix\"><\/div><ul class=\"ui--tabs-contents text-left clearfix\"><li id=\"about-us\" class=\"hidden\"> <div class=\"ui-row row\">\n <div   class=\"ui-column span6\"><div class=\"ui--image-wrap clearfix\"><a href=\"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/08\/GII-Presentation-Material_130821.pdf\"><img  id=\"ui--image-1\" class=\"ui--image ui--animation\" src=\"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/08\/Introduction-to-the-GII-1.png\" alt=\"Introduction to the GII\" title=\"Introduction to the GII\" data-at2x=\"\"\/><\/a><\/div><div  class=\"ui--divider ui--animation clearfix ui--divider-solid-line\"><\/div><div  class=\"ui--animation-in make--fx--appear ui--pass clearfix\" data-fx=\"fx--appear\" data-delay=\"150\" data-start-delay=\"0\"><div class=\"auto-format ui--animation\"><p>Supporting Indonesia\u2019s endeavour in sustainable reduction of carbon emissions is Indonesian-German Green Infrastructure Initiative (GII). GII is part of Indonesian-German climate initiative agreed in the framework of Indonesian-German bilateral government negotiations on 1 October 2019 in Berlin. <\/p>\n<p>GII encompasses a five-year Financial Cooperation (FC) facility (low-interest loans, promotional loans) of up to EUR 2.5 billion to support environmental and\/or climate-relevant infrastructure projects via subsidized and promotional loans through the German Development Bank (KfW). <\/p>\n<p>GII\u2018s investments are promoting green infrastructure in Indonesia in three thematic sectors: Solid Waste Management, Water and Wastewater Management, and Urban Public Transport.  <\/p>\n<p>The Coordinating Ministry for Maritime Affairs and Investment (CMMAI) and the Committee for the Acceleration of Priority Infrastructure Delivery (KPPIP) were mandated to coordinate and accelerate the planning and implementation of priority infrastructure projects. <\/p>\n<\/div><\/div><\/div> \n\n <div   class=\"ui-column span6\"><h4 id=\"custom-title-h4-1\" class=\"ui--animation \" style=\"\">GII Objectives<\/h4><div class=\"auto-format ui--animation\"><p>The GII objectives are increasing capacities of responsible actors at national and sub-national level (provinces, districts, cities), enabling them to select and prioritize infrastructure projects for the Indonesian-German Green Infrastructure Initiative on the basis of specific criteria agreed with KfW (national level) and preparing them for financing in cooperation with the sub-national and local level. <\/p>\n<\/div><div  class=\"ui--toggle ui--animation clearfix ui--toggle-state-closed\"><div class=\"ui--toggle-title\"><a href=\"javascript:;\"><span class=\"ui--toggle-icon\"><i class=\"ui--icon show-when-closed fontawesome-plus\"><\/i><i class=\"ui--icon show-when-opened fontawesome-minus\"><\/i><\/span><span class=\"ui--toggle-title-text heading\">Project Stakeholders<\/span><\/a><\/div><div class=\"ui--toggle-content\"><div class=\"auto-format ui--animation\"><p>Stakeholders involved in capacity development activities are Coordinating Ministry for Maritime Affairs and Investment (CMMAI) and the Committee for the Acceleration of Priority Infrastructure Delivery (KPPIP) as well as the Agencies for Regional Development (BAPPEDA) and other relevant local agencies in four selected provinces namely, West Java, Central Java, East Java, and Bali.  <\/p>\n<\/div><\/div><\/div><div  class=\"ui--toggle ui--animation clearfix ui--toggle-state-closed\"><div class=\"ui--toggle-title\"><a href=\"javascript:;\"><span class=\"ui--toggle-icon\"><i class=\"ui--icon show-when-closed fontawesome-plus\"><\/i><i class=\"ui--icon show-when-opened fontawesome-minus\"><\/i><\/span><span class=\"ui--toggle-title-text heading\">Project Pipelines<\/span><\/a><\/div><div class=\"ui--toggle-content\"><div class=\"auto-format ui--animation\"><p>At the macro level, GII\u2019s capacity building activities will strengthen the internal processes of these government institutions for: identifying, planning, and preparing infrastructure projects that have potential to be improved and coordinated more effectively. <\/p>\n<\/div><h3 id=\"custom-title-h3-1\" class=\"ui--animation \" style=\"\">Criteria Catalogues Guidelines<\/h3><div class=\"auto-format ui--animation\"><p>At the micro level, GII\u2019s activities will advance the technical skills of stakeholders to develop and apply general, sector specific and gender-oriented criteria for the selection and preparation of green infrastructure projects. All selection criteria will incorporate the \u201cLeave No One Behind\u201d (LNOB) principle.<\/p>\n<\/div><\/div><\/div><div  class=\"ui--toggle ui--animation clearfix ui--toggle-state-closed\"><div class=\"ui--toggle-title\"><a href=\"javascript:;\"><span class=\"ui--toggle-icon\"><i class=\"ui--icon show-when-closed fontawesome-plus\"><\/i><i class=\"ui--icon show-when-opened fontawesome-minus\"><\/i><\/span><span class=\"ui--toggle-title-text heading\">Project Outputs<\/span><\/a><\/div><div class=\"ui--toggle-content\"><div class=\"auto-format ui--animation\"><p>GII, working with relevant stakeholders, is targeting 6 from up to 18 project proposals to enter the pre-feasibility stage. This is done by jointly working with the local planning authorities in the provinces of West Java, Central Java, East Java and Bali to develop project proposals according to international standards. <\/p>\n<p>The preliminary feasibility studies will prepare potential bankable environmental and\/or climate-relevant infrastructure projects in Indonesia to be financed and implemented by KfW.  <\/p>\n<p>The studies will support partners at national, sub-national, and local levels to identify priority green infrastructure projects in a coordinated manner and prepare them for implementation. <\/p>\n<\/div><\/div><\/div><\/div> \n\n<\/div> \n <\/li><li id=\"giiprojects\" class=\"hidden\"> <div class=\"ui-row row\">\n <div   class=\"ui-column span6\"><div class=\"ui--image-wrap clearfix\"><img  id=\"ui--image-2\" class=\"ui--image ui--animation\" src=\"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2022\/06\/15-proposals-PFS-2.png\" alt=\"15 proposals PFS (2)\" title=\"15 proposals PFS (2)\" data-at2x=\"\"\/><\/div><\/div> \n\n <div   class=\"ui-column span6\"><div class=\"text-left\"><div  class=\"ui--toggle ui--animation clearfix ui--toggle-state-opened\"><div class=\"ui--toggle-title\"><a href=\"javascript:;\"><span class=\"ui--toggle-icon\"><i class=\"ui--icon show-when-closed fontawesome-plus\"><\/i><i class=\"ui--icon show-when-opened fontawesome-minus\"><\/i><\/span><span class=\"ui--toggle-title-text heading\">Solid Waste Management<\/span><\/a><\/div><div class=\"ui--toggle-content\"><div class=\"auto-format ui--animation\"><p><strong>Solid Waste Management (EUR 312 million proposed)<\/strong><\/p>\n<p><strong>1. Southern West Java Integrated Solid Waste Management \u2013 South Coast (Rp 640 billion\/ EUR 39 million)<\/strong><br \/>\nConstruction and upgrading of waste treatment and final deposit facilities in many cities and districts within the southern part of West Java. Construction of an integrated regional sanitary landfill with technology to potentially process waste into Refuse Derived Fuel (RDF) which could serve the greater Sukabumi, Tasikmalaya and Cianjur area.<\/p>\n<p><strong>2. Rebana Regional Integrated Solid Waste Management (Ciayu Maja Kuning) (Rp 819 billion\/ EUR 50 million)<\/strong><br \/>\nImprovement and construction of waste management infrastructure in the north eastern part of West Java with a focus on the Cirebon area (sanitary landfill with 500 ton\/day capacity and potential RDF application plus intermediary waste treatment and sorting stations.<\/p>\n<p><strong>3. Regional Sanitary Landfill (TPA) Sarbagita (Rp 480 billion\/ EUR 30 million)<\/strong><br \/>\nThe regional sanitary landfill in southern Bali (TPA Suwung) will be closed and renaturalized with methane capture and leachate treatment technology. The site will be transformed into an educational park. The new designated landfill in Bali (TPA Sarbagita) will be upgraded in the framework of the GII. Waste treatment from the source will be applied.<\/p>\n<p><strong>4. Development of TPA Regional Kediri (Sanitary Landfill) (Rp 600 billion\/ EUR 37 million)<\/strong><br \/>\nDevelopment of a 50 Ha sanitary landfill for the greater Kediri area in East Java with potentially Refuse Derived Fuel (RDF) technology and the construction of sorting stations and deposit sites in the area.<\/p>\n<p><strong>5. TPST Regional Magelang and Borobudur (Integrated landfill + 3R) \u2013 Development of Integrated Solid Waste Treatment in Magelang (Rp 942 billion\/ EUR 58 million)<\/strong><br \/>\nConstruction of sorting stations, final deposit sites and sanitary landfills in the greater Magelang area in support of the Borobudur super-priority tourist destination with potential to explore Refuse Derived Fuel (RDF) technology and state of the art sealing and renaturalization of existing and over capacity landfills.<\/p>\n<p style=\"padding-left: 40px;\"><strong>TPA Regional (Northern Central Java) \u2013 Development of Integrated Solid Waste Treatment and Regional Landfill in Central Java (Rp 1 trillion\/ EUR 61 million)<\/strong><br \/>\nConstruction of deposit sites, sanitary landfills and a medical waste deposit site in northern Central Java with the potential to explore Refuse Derived Fuel (RDF) technology and state of the art sealing of existing and over capacity landfills.<\/p>\n<\/div><\/div><\/div><div  class=\"ui--toggle ui--animation clearfix ui--toggle-state-opened\"><div class=\"ui--toggle-title\"><a href=\"javascript:;\"><span class=\"ui--toggle-icon\"><i class=\"ui--icon show-when-closed fontawesome-plus\"><\/i><i class=\"ui--icon show-when-opened fontawesome-minus\"><\/i><\/span><span class=\"ui--toggle-title-text heading\">Water and Wastewater Management<\/span><\/a><\/div><div class=\"ui--toggle-content\"><div class=\"auto-format ui--animation\"><p><strong>Water and Wastewater Management (EUR 449 million proposed)<\/strong><\/p>\n<p><strong>6. Integrated Citarum Wastewater Management (Rp 4,3 trillion\/ EUR 264 million)<\/strong><br \/>\nOnce one of the dirtiest rivers in the world, the Citarum River has recovered, complementary to the ongoing support from the World Bank, the West Java provincial government has proposed to tackle the still pending issues of domestic wastewater and industrial wastewater treatment withing the framework of the Green Infrastructure Initiative together with a sewage system for the greater Bandung area. The scope of this investment is focused on planning and development of domestic wastewater infrastructure in the form of a Domestic Wastewater Management System (SPALD).<\/p>\n<p style=\"padding-left: 40px;\"><strong>Southern West Java Integrated Water Supply and Wastewater Management (Rp 550 billion\/ EUR 34 million)<\/strong><br \/>\nThe scope of this activity is focused on planning and construction of a Drinking Water Supply System (SPAM) and Domestic Wastewater Management System (SPALD) in the southern part of West Java. This includes the raw water supply system, transmission pipelines, water treatment plants and main distribution pipeline, but also the wastewater component in the form of a domestic wastewater management system.<\/p>\n<p><strong>7. SPAM Regional Lintas Tengah (Rp 1,8 trillion\/ EUR 111 million)<\/strong><br \/>\nThe construction of a comprehensive water supply system for East Java (Kediri, Nganjuk and Jombang) with the Brantas River as a potential water source. Including the raw water intake, water treatment plants, transmission pipes and main distribution pipes. In addition, renewable energy solutions (i.e. solar) for the reservoir will be considered.<\/p>\n<p><strong>8. Bengawan Solo Ayu (Water Quality Improvement) (Rp 650 billion\/ EUR 40 million)<\/strong><br \/>\nOne of the dirtiest rivers in Java crossing from central Java into East Java, the Bengawan Solo River requires a comprehensive approach, in order to provide a sustainable livelihood to millions of people. The development and construction of wastewater infrastructure (treatment plants in Central Java (IPAL and ILPT) and also water supply infrastructure (SPAM) is a first step in cleaning up this river.<\/p>\n<p><strong>Cross Sectoral Proposal (185 million proposed)<\/strong><br \/>\nOne proposal within the Green Infrastructure Initiative shines out by being a cross sectoral integrated approach combing all three sectors of the GII under the topic of low carbon tourism development.<\/p>\n<p><strong>9. Low Carbon Tourism Destination Development: Nusa Penida, Nusa Lembongan &#038; Ceningan (Rp 3 trillion\/ EUR 185 million)<\/strong><br \/>\nThe natural beauty and ecosystem of the three Nusa Island near Bali (Lembongan, Ceningan and Penida) are in acute danger to fall victim to fast paced tourism development, mostly dependent on day tour visitors. Without a comprehensive solid waste management system, a water supply and wastewater system the islands ecosystem is in danger. Through the GII this infrastructure investment is proposed in an integrated manner, also capitalizing on the plans to transform the island into a low carbon tourism destination with an electric mobility concept and renewable energy powered grid.<\/p>\n<\/div><\/div><\/div><div  class=\"ui--toggle ui--animation clearfix ui--toggle-state-opened\"><div class=\"ui--toggle-title\"><a href=\"javascript:;\"><span class=\"ui--toggle-icon\"><i class=\"ui--icon show-when-closed fontawesome-plus\"><\/i><i class=\"ui--icon show-when-opened fontawesome-minus\"><\/i><\/span><span class=\"ui--toggle-title-text heading\">Urban Public Transport<\/span><\/a><\/div><div class=\"ui--toggle-content\"><div class=\"auto-format ui--animation\"><p><strong>Urban Public Transport (EUR 4057 million proposed)<\/strong><\/p>\n<p><strong>10. BRT \u2013 Bandung Metropolitan Urban Public Transport (Electric Bus) (Rp 1,1 trillion\/ EUR 67 million)<\/strong><\/p>\n<p>A comprehensive Bus Rapid Transit (BRT) system covering the greater Bandung area with a planned 23 km of dedicated BRT lanes, 27 stations, 12 routes with a total of 350 low floor, potentially Battery Electric Busses (BEB) buses covering 120 000 trips\/day. The system will be integrated with the also proposed Bandung LRT, existing train networks and the new Jakarta-Bandung High Speed Rail service.<\/p>\n<p><strong>11. Bandung Metropolitan Urban Railways (Bandung LRT) (Rp 51 trillion\/ EUR 3,1 billion)<\/strong><br \/>\nA Light Rail Transit (LRT) project in the greater Bandung area with two planned corridors. The first phase (north-south), is containing 17 stations and 14.2 km of tracks. It connects northern Bandung with the south and intersects with the second phase at the Leuwipanjang Terminal. The second phase connects the east with the west of Bandung with a total of 16 stations and 16.55 km of tracks. This corridor connects the intercity bus terminal in Leuwipanjang with the Jakarta Bandung High Speed Rail station in Tegalluar.<\/p>\n<p><strong>12. Surabaya Regional Railways Line (SRRL) 2nd Phase (Rp 8,3 trillion\/ EUR 512 mio)<\/strong><br \/>\nThe KfW supported 1st phase of the Surabaya Regional Railways Line (SRRL) shall be expanded with a 2nd phase connecting Lambongan, Mojokerto and Gresik via Surabaya. The proposal includes double tracking, electrification and grade separation for the 2nd phase.<\/p>\n<p style=\"padding-left: 40px;\"><strong>Autonomous Railrapid Transit Surabaya \u2013 Bangkalan (3,5 trillion\/ EUR 216 mio)<\/strong><br \/>\nAutonomous Railrapid Transit (ART) is a rather new trackless mass transit technology, featuring a multi-unit, two-way vehicle with a low floor. It uses all-wheel steering control technology, virtual rail tracking via LIDAR sensors and a train-like running mode and is proposed for northern Surabaya. Three options for a corridor have been proposed. This new project idea needs to be assessed in a more comprehensive manner in a PFS.<\/p>\n<p><strong>13. Surabaya BRT (Rp 1,5 trillion\/ EUR 92 mio)<\/strong><br \/>\nA comprehensive Bus Rapid Transit (BRT) system for the greater Surabaya area, potentially Battery Electric Busses (BEB) buses in an east-west and north-south corridor. The system will be integrated with the also proposed SRRL and existing train networks.<\/p>\n<p><strong>14. Corridor Petanglong (Greater Pekalongan) (Rp 735 billion\/ EUR 45 mio)<\/strong><br \/>\nThe economic super corridor in northern Central Java (Petalongan) lacks public transport options along rapidly developing industrial parks. To accommodate future demand of commuters to the factories in that region five corridors for a bus network utilizing Battery Electric Busses (BEBs) have been proposed in the area.<\/p>\n<p><strong>15. Public Transport in Greater Solo: phasing out diesel fleets and Corridor Extension (Rp 1,9 trillion\/ EUR 117 million)<\/strong><br \/>\nThe city of Solo has been a frontrunner in developing BRT systems in Indonesia. Through the Green Infrastructure Initiative four BRT corridors in the greater Solo area shall be shifted to BEBs. In addition, two new BEB corridors shall be developed together with accompanying feeder lines and potentially a renewable energy-based charging station for the buses (i.e. solar)<\/p>\n<\/div><\/div><\/div><\/div><\/div> \n\n<\/div> \n <\/li><\/ul><\/div>","protected":false},"excerpt":{"rendered":"<p>About GIIGreen Infrastructure Initiative (GII)GII Projects Supporting Indonesia\u2019s endeavour in sustainable reduction of carbon emissions is Indonesian-German Green Infrastructure Initiative (GII). GII is part of Indonesian-German climate initiative agreed in the framework of Indonesian-German bilateral government negotiations on 1 October 2019 in Berlin. GII encompasses a five-year Financial Cooperation (FC) facility (low-interest loans, promotional loans) [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":111,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>About Us - Green Infrastructure Initiative<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/gii.maritim.go.id\/en\/about\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"About Us - Green Infrastructure Initiative\" \/>\n<meta property=\"og:description\" content=\"About GIIGreen Infrastructure Initiative (GII)GII Projects Supporting Indonesia\u2019s endeavour in sustainable reduction of carbon emissions is Indonesian-German Green Infrastructure Initiative (GII). GII is part of Indonesian-German climate initiative agreed in the framework of Indonesian-German bilateral government negotiations on 1 October 2019 in Berlin. GII encompasses a five-year Financial Cooperation (FC) facility (low-interest loans, promotional loans) [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gii.maritim.go.id\/en\/about\/\" \/>\n<meta property=\"og:site_name\" content=\"Green Infrastructure Initiative\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-02T06:27:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/07\/GII-Logo-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"300\" \/>\n\t<meta property=\"og:image:height\" content=\"300\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/gii.maritim.go.id\/#organization\",\"name\":\"Green Infrastructure Initiative\",\"url\":\"https:\/\/gii.maritim.go.id\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/gii.maritim.go.id\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/07\/cropped-GII-Logo.png\",\"contentUrl\":\"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/07\/cropped-GII-Logo.png\",\"width\":512,\"height\":512,\"caption\":\"Green Infrastructure Initiative\"},\"image\":{\"@id\":\"https:\/\/gii.maritim.go.id\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/gii.maritim.go.id\/#website\",\"url\":\"https:\/\/gii.maritim.go.id\/\",\"name\":\"Green Infrastructure Initiative\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/gii.maritim.go.id\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/gii.maritim.go.id\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/gii.maritim.go.id\/en\/about\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/07\/GII-Logo-2.png\",\"contentUrl\":\"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/07\/GII-Logo-2.png\",\"width\":300,\"height\":300},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/gii.maritim.go.id\/en\/about\/#webpage\",\"url\":\"https:\/\/gii.maritim.go.id\/en\/about\/\",\"name\":\"About Us - Green Infrastructure Initiative\",\"isPartOf\":{\"@id\":\"https:\/\/gii.maritim.go.id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/gii.maritim.go.id\/en\/about\/#primaryimage\"},\"datePublished\":\"2021-07-16T00:18:01+00:00\",\"dateModified\":\"2022-06-02T06:27:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/gii.maritim.go.id\/en\/about\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/gii.maritim.go.id\/en\/about\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/gii.maritim.go.id\/en\/about\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/gii.maritim.go.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"About Us\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"About Us - Green Infrastructure Initiative","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/gii.maritim.go.id\/en\/about\/","og_locale":"en_US","og_type":"article","og_title":"About Us - Green Infrastructure Initiative","og_description":"About GIIGreen Infrastructure Initiative (GII)GII Projects Supporting Indonesia\u2019s endeavour in sustainable reduction of carbon emissions is Indonesian-German Green Infrastructure Initiative (GII). GII is part of Indonesian-German climate initiative agreed in the framework of Indonesian-German bilateral government negotiations on 1 October 2019 in Berlin. GII encompasses a five-year Financial Cooperation (FC) facility (low-interest loans, promotional loans) [&hellip;]","og_url":"https:\/\/gii.maritim.go.id\/en\/about\/","og_site_name":"Green Infrastructure Initiative","article_modified_time":"2022-06-02T06:27:04+00:00","og_image":[{"width":300,"height":300,"url":"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/07\/GII-Logo-2.png","type":"image\/png"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Organization","@id":"https:\/\/gii.maritim.go.id\/#organization","name":"Green Infrastructure Initiative","url":"https:\/\/gii.maritim.go.id\/","sameAs":[],"logo":{"@type":"ImageObject","@id":"https:\/\/gii.maritim.go.id\/#logo","inLanguage":"en-US","url":"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/07\/cropped-GII-Logo.png","contentUrl":"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/07\/cropped-GII-Logo.png","width":512,"height":512,"caption":"Green Infrastructure Initiative"},"image":{"@id":"https:\/\/gii.maritim.go.id\/#logo"}},{"@type":"WebSite","@id":"https:\/\/gii.maritim.go.id\/#website","url":"https:\/\/gii.maritim.go.id\/","name":"Green Infrastructure Initiative","description":"","publisher":{"@id":"https:\/\/gii.maritim.go.id\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gii.maritim.go.id\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/gii.maritim.go.id\/en\/about\/#primaryimage","inLanguage":"en-US","url":"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/07\/GII-Logo-2.png","contentUrl":"https:\/\/gii.maritim.go.id\/wp-content\/uploads\/2021\/07\/GII-Logo-2.png","width":300,"height":300},{"@type":"WebPage","@id":"https:\/\/gii.maritim.go.id\/en\/about\/#webpage","url":"https:\/\/gii.maritim.go.id\/en\/about\/","name":"About Us - Green Infrastructure Initiative","isPartOf":{"@id":"https:\/\/gii.maritim.go.id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/gii.maritim.go.id\/en\/about\/#primaryimage"},"datePublished":"2021-07-16T00:18:01+00:00","dateModified":"2022-06-02T06:27:04+00:00","breadcrumb":{"@id":"https:\/\/gii.maritim.go.id\/en\/about\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gii.maritim.go.id\/en\/about\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/gii.maritim.go.id\/en\/about\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/gii.maritim.go.id\/en\/"},{"@type":"ListItem","position":2,"name":"About Us"}]}]}},"_links":{"self":[{"href":"https:\/\/gii.maritim.go.id\/en\/wp-json\/wp\/v2\/pages\/52"}],"collection":[{"href":"https:\/\/gii.maritim.go.id\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/gii.maritim.go.id\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/gii.maritim.go.id\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/gii.maritim.go.id\/en\/wp-json\/wp\/v2\/comments?post=52"}],"version-history":[{"count":6,"href":"https:\/\/gii.maritim.go.id\/en\/wp-json\/wp\/v2\/pages\/52\/revisions"}],"predecessor-version":[{"id":612,"href":"https:\/\/gii.maritim.go.id\/en\/wp-json\/wp\/v2\/pages\/52\/revisions\/612"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gii.maritim.go.id\/en\/wp-json\/wp\/v2\/media\/111"}],"wp:attachment":[{"href":"https:\/\/gii.maritim.go.id\/en\/wp-json\/wp\/v2\/media?parent=52"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}